Sample Timeline
Desired Graduation: Winter 2011
April 11,2010- Timeline
June 1, 2010 – First Draft of Thesis to Dr. Newberry.
June 5, 2010 – Full Literature Review to Dr. Newberry.
June 6, 2010 – MA Proposal Draft to Dr. Newberry
June 8, 2010 – IRB Application to Dr. Newberry.
June 10, 2010 – Project Prototype Available and to Dr. Newberry.
July 7, 2010 – Pilot Test Project
July 27, 2010 – Grad Check and Apply to Graduate (Petition to Walk)
August 10, 2010 – Revisions to Project based on Pilot Test Complete.
September 10, 2010 – Implement Project.
September 25, 2010 – conclude implementation and analyze data on results.
October 10, 2010 – Modify chapter 3 based on results of implementation.
November 10, 2010 – Final Version of Literature Review Complete.
December 10, 2010 – Final Version of Introduction Complete.
December 20, 2010 – Final Version of Chapter 4 Complete.
December 21, 2010 – Final Draft of Thesis Complete and Sent to Editor.
January 15, 2011 – Final Draft of Thesis Back From Editor.
January 2011 – Enroll in ETEC 699.
February 15, 2011 – Thesis and Project complete and available to First Reader for review.
March 15, 2011 – Thesis approved by First reader and available to Second Reader for review.